You can use one of two methods for shutting down the server from main power mode to standby power mode.ġ. Transition blink = 1 Hz on/off at 50% duty cycle during SP boot and POST Standby blink = 0.1 second on / 2.9 seconds off See the corresponding SP documentation for details.įIGURE 2-1 Power Button and Power/OK LED Location From the ILOM or ELOM web interface, use the Remote Power Control screen.From the the ILOM or ELOM CLI, enter start /SYS.You can also use the SP to turn on main power. When main power is applied to the full server, the green Power/OK LED next to the Power button lights and remains lit.įIGURE 2-1 shows the location of the power button. See FIGURE 2-1 for the Power button location. Use a non-conducting pointed object, such as a stylus to press and release the recessed Power button on the server front panel. Note - See your chassis documentation for information about powering on the chassis.Ģ. When the server module is in standby power mode, the green Power/OK LED on the front panel blinks, indicating that the service processor (SP) is working and the system is ready to be fully powered on to main power mode. When you insert your server module into a chassis that is powered on, it comes up to standby power mode. Severe damage to server components can occur if the server is operated without adequate cooling mechanisms.ġ. Note - Before powering on your server for the first time, follow the installation instructions provided in the Sun Blade X6250 Modular Server Installation Guide, (820-1182.)Ĭaution - Do not operate the server without all component heatsinks, air baffles, and covers installed.